TY - JOUR
T1 - Prioritizing collaborative scheduling practices based on their impact on project performance
AU - He, Chuanni
AU - Liu, Min
AU - Alves, Thais da C.L.
AU - Scala, Natalie M.
AU - Hsiang, Simon M.
N1 - Publisher Copyright:
© 2022 Informa UK Limited, trading as Taylor & Francis Group.
PY - 2022
Y1 - 2022
N2 - Collaborative scheduling (CS) and related practices impact the performance of construction projects which can be measured by key performance indicators (KPIs). However, little is known about which of these practices are implemented and how their combined implementation might impact KPIs. The objectives of this research are to identify perceptions of CS practices that drive project performance, define CS practices used by industry that impact KPIs, and establish practices that are more commonly implemented and have a higher potential to positively impact KPIs. The research team conducted a nationwide survey in the United States and obtained 241 usable responses. Utilizing an information theory approach to measure the uncertainty of implementation and impact of each practice, the research built a set of Chow–Liu tree models to determine the most efficient sequence of actions to improve CS. Results indicate that meeting owners’ expectation throughout the life-cycle of the project from design through construction and commissioning, using the schedule to support a strong project culture, and an effective communication plan were the top CS levers for overall KPI improvement. An innovative method was developed to help construction project managers discover the value of each CS practice, the relation between CS practices, and CS practices’ influence to project KPIs so that managers can improve KPIs efficiently by prioritizing their CS practices according to their own project needs.
AB - Collaborative scheduling (CS) and related practices impact the performance of construction projects which can be measured by key performance indicators (KPIs). However, little is known about which of these practices are implemented and how their combined implementation might impact KPIs. The objectives of this research are to identify perceptions of CS practices that drive project performance, define CS practices used by industry that impact KPIs, and establish practices that are more commonly implemented and have a higher potential to positively impact KPIs. The research team conducted a nationwide survey in the United States and obtained 241 usable responses. Utilizing an information theory approach to measure the uncertainty of implementation and impact of each practice, the research built a set of Chow–Liu tree models to determine the most efficient sequence of actions to improve CS. Results indicate that meeting owners’ expectation throughout the life-cycle of the project from design through construction and commissioning, using the schedule to support a strong project culture, and an effective communication plan were the top CS levers for overall KPI improvement. An innovative method was developed to help construction project managers discover the value of each CS practice, the relation between CS practices, and CS practices’ influence to project KPIs so that managers can improve KPIs efficiently by prioritizing their CS practices according to their own project needs.
KW - Collaborative scheduling
KW - information theory
KW - practice
KW - survey
KW - uncertainty
UR - http://www.scopus.com/inward/record.url?scp=85126531392&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=85126531392&partnerID=8YFLogxK
U2 - 10.1080/01446193.2022.2048042
DO - 10.1080/01446193.2022.2048042
M3 - Article
AN - SCOPUS:85126531392
SN - 0144-6193
VL - 40
SP - 618
EP - 637
JO - Construction Management and Economics
JF - Construction Management and Economics
IS - 7-8
ER -