Invaders do not require high resource levels to maintain physiological advantages in a temperate deciduous forest

J. Mason Heberling, Jason D. Fridley

Research output: Contribution to journalArticlepeer-review

42 Scopus citations

Abstract

Non-native, invasive plants are commonly typified by trait strategies associated with high resource demands and plant invasions are often thought to be dependent upon site resource availability or disturbance. However, the invasion of shade-tolerant woody species into deciduous forests of the Eastern United States seems to contradict such generalization, as growth in this ecosystem is strongly constrained by light and, secondarily, nutrient stress. In a factorial manipulation of light and soil nitrogen availability, we established an experimental resource gradient in a secondary deciduous forest to test whether three common, woody, invasive species displayed increased metabolic performance and biomass production compared to six co-occurring woody native species, and whether these predicted differences depend upon resource supply. Using hierarchical Bayesian models of photosynthesis that included leaf trait effects, we found that invasive species exhibited functional strategies associated with higher rates of carbon gain. Further, invader metabolic and growth-related attributes were more responsive to increasing light availability than those of natives, but did not fall below average native responses even in low light. Surprisingly, neither group showed direct trait or growth responses to soil N additions. However, invasive species showed increased photosynthetic nitrogen use efficiencies with decreasing N availability, while that of natives remained constant. Although invader advantage over natives was amplified in higher resource conditions in this forest, our results indicate that some invasive species can maintain physiological advantages over co-occurring natives regardless of resource conditions.

Original languageEnglish (US)
Pages (from-to)874-884
Number of pages11
JournalEcology
Volume97
Issue number4
DOIs
StatePublished - Apr 1 2016

Keywords

  • Bayesian hierarchical models
  • Forest invasion
  • Functional traits
  • Light addition
  • Nitrogen fertilization
  • Photosynthesis
  • Resource limitation
  • Understory shrubs

ASJC Scopus subject areas

  • Ecology, Evolution, Behavior and Systematics

Fingerprint

Dive into the research topics of 'Invaders do not require high resource levels to maintain physiological advantages in a temperate deciduous forest'. Together they form a unique fingerprint.

Cite this