Evacuation of a residual oil pipeline by inert gas displacement.

S. Webb, E. Bogucz, E. Levy, M. Barrett, C. Snyder, C. Waters

Research output: Contribution to journalArticlepeer-review

Abstract

An analysis was developed to model inert gas displacement process for evacuating a high pour point oil from a long pipeline. The governing equations were derived from the basic conservation equations for mass, momentum and energy. The resulting computer program accounts for effects such as pipeline elevation changes, laminar and turbulent oil flow, temperature dependent oil viscosity and heat loss from the oil to the ground. Results of computations for an 84 mile long residual oil pipeline operated by the Pennsylvania Power and Light Company are presented and compared with pressure measurements obtained during a trial purge of the system. The calculations show that the minimum nitrogen volume required for a successful pipeline evacuation increases considerably with increased delay time. In addition, the theoretical results indicate that for the PP&L case, the pipeline purge operation must begin within 20 hours of a shutdown to avoid evacuation difficulties. (A)

Original languageEnglish (US)
Journal[No source information available]
StatePublished - 1984
Externally publishedYes

ASJC Scopus subject areas

  • Mechanical Engineering

Fingerprint

Dive into the research topics of 'Evacuation of a residual oil pipeline by inert gas displacement.'. Together they form a unique fingerprint.

Cite this