Accelerating construction of roadway bridges using alternative techniques and procurement methods

Ossama Salem, Baris Salman, Sudipta Ghorai

Research output: Research - peer-reviewArticle

Abstract

Approximately a quarter of the bridges in the United States are classified as either functionally obsolete or structurally deficient by the United States Department of Transportation (USDOT). As such, transportation agencies are challenged to handle the increasing need of upgrades with limited resources. Accelerated Bridge Construction (ABC) can reduce the construction duration and can decrease the environmental and socio-economic impacts of repair and upgrade activities by minimizing traffic disruptions. As several states are using accelerated construction techniques, a standard guideline would be highly beneficial for these agencies in developing or improving the ABC decision-making process. As problems are often project specific, a decision tool can assist in determining the viability of ABC over traditional construction methods and in selecting appropriate construction and contracting strategies on a case-by-case basis. This paper presents findings of a recent survey with regards to utilization of ABC strategies by state Departments of Transportation (DOTs), and a decision support framework which consists of three models: (1) Analytical Hierarchy Process (AHP) based ABC vs. traditional construction decision-making model; (2) ABC alternatives selection model; and (3) procurement method and contract selection model. The paper also discusses the use of ABC in New York State and describes a New York State bridge project to validate the AHP model.

LanguageEnglish (US)
Pages1-3
Number of pages3
JournalTransport
DOIs
StateAccepted/In press - Apr 30 2017

Fingerprint

Decision making
Repair
Economics

Keywords

  • accelerated bridge construction
  • analytical hierarchy process
  • contracting requirements
  • decision-making models
  • procurement methods

ASJC Scopus subject areas

  • Automotive Engineering
  • Mechanical Engineering

Cite this

Accelerating construction of roadway bridges using alternative techniques and procurement methods. / Salem, Ossama; Salman, Baris; Ghorai, Sudipta.

In: Transport, 30.04.2017, p. 1-3.

Research output: Research - peer-reviewArticle

@article{4dcd90e24df14939a8ab41a5c2acf9c1,
title = "Accelerating construction of roadway bridges using alternative techniques and procurement methods",
abstract = "Approximately a quarter of the bridges in the United States are classified as either functionally obsolete or structurally deficient by the United States Department of Transportation (USDOT). As such, transportation agencies are challenged to handle the increasing need of upgrades with limited resources. Accelerated Bridge Construction (ABC) can reduce the construction duration and can decrease the environmental and socio-economic impacts of repair and upgrade activities by minimizing traffic disruptions. As several states are using accelerated construction techniques, a standard guideline would be highly beneficial for these agencies in developing or improving the ABC decision-making process. As problems are often project specific, a decision tool can assist in determining the viability of ABC over traditional construction methods and in selecting appropriate construction and contracting strategies on a case-by-case basis. This paper presents findings of a recent survey with regards to utilization of ABC strategies by state Departments of Transportation (DOTs), and a decision support framework which consists of three models: (1) Analytical Hierarchy Process (AHP) based ABC vs. traditional construction decision-making model; (2) ABC alternatives selection model; and (3) procurement method and contract selection model. The paper also discusses the use of ABC in New York State and describes a New York State bridge project to validate the AHP model.",
keywords = "accelerated bridge construction, analytical hierarchy process, contracting requirements, decision-making models, procurement methods",
author = "Ossama Salem and Baris Salman and Sudipta Ghorai",
year = "2017",
month = "4",
doi = "10.3846/16484142.2017.1300942",
pages = "1--3",
journal = "Transport",
issn = "1648-4142",
publisher = "Vilnius Gediminas Technical University",

}

TY - JOUR

T1 - Accelerating construction of roadway bridges using alternative techniques and procurement methods

AU - Salem,Ossama

AU - Salman,Baris

AU - Ghorai,Sudipta

PY - 2017/4/30

Y1 - 2017/4/30

N2 - Approximately a quarter of the bridges in the United States are classified as either functionally obsolete or structurally deficient by the United States Department of Transportation (USDOT). As such, transportation agencies are challenged to handle the increasing need of upgrades with limited resources. Accelerated Bridge Construction (ABC) can reduce the construction duration and can decrease the environmental and socio-economic impacts of repair and upgrade activities by minimizing traffic disruptions. As several states are using accelerated construction techniques, a standard guideline would be highly beneficial for these agencies in developing or improving the ABC decision-making process. As problems are often project specific, a decision tool can assist in determining the viability of ABC over traditional construction methods and in selecting appropriate construction and contracting strategies on a case-by-case basis. This paper presents findings of a recent survey with regards to utilization of ABC strategies by state Departments of Transportation (DOTs), and a decision support framework which consists of three models: (1) Analytical Hierarchy Process (AHP) based ABC vs. traditional construction decision-making model; (2) ABC alternatives selection model; and (3) procurement method and contract selection model. The paper also discusses the use of ABC in New York State and describes a New York State bridge project to validate the AHP model.

AB - Approximately a quarter of the bridges in the United States are classified as either functionally obsolete or structurally deficient by the United States Department of Transportation (USDOT). As such, transportation agencies are challenged to handle the increasing need of upgrades with limited resources. Accelerated Bridge Construction (ABC) can reduce the construction duration and can decrease the environmental and socio-economic impacts of repair and upgrade activities by minimizing traffic disruptions. As several states are using accelerated construction techniques, a standard guideline would be highly beneficial for these agencies in developing or improving the ABC decision-making process. As problems are often project specific, a decision tool can assist in determining the viability of ABC over traditional construction methods and in selecting appropriate construction and contracting strategies on a case-by-case basis. This paper presents findings of a recent survey with regards to utilization of ABC strategies by state Departments of Transportation (DOTs), and a decision support framework which consists of three models: (1) Analytical Hierarchy Process (AHP) based ABC vs. traditional construction decision-making model; (2) ABC alternatives selection model; and (3) procurement method and contract selection model. The paper also discusses the use of ABC in New York State and describes a New York State bridge project to validate the AHP model.

KW - accelerated bridge construction

KW - analytical hierarchy process

KW - contracting requirements

KW - decision-making models

KW - procurement methods

UR - http://www.scopus.com/inward/record.url?scp=85018408215&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=85018408215&partnerID=8YFLogxK

U2 - 10.3846/16484142.2017.1300942

DO - 10.3846/16484142.2017.1300942

M3 - Article

SP - 1

EP - 3

JO - Transport

T2 - Transport

JF - Transport

SN - 1648-4142

ER -