Calculated based on number of publications stored in Pure and citations from Scopus
20032023

Research activity per year

If you made any changes in Pure these will be visible here soon.
Filter
Conference contribution

Search results

  • 2023

    Situation Awareness Based Smart Contract for Modular Construction

    Li, H., Chen, G., Liu, M., Hsiang, S. M. & Jarvamardi, A., 2023, Proceedings of the Canadian Society of Civil Engineering Annual Conference 2021 - CSCE21 Construction Track Volume 1. Walbridge, S., Nik-Bakht, M., Ng, K. T., Shome, M., Alam, M. S., el Damatty, A. & Lovegrove, G. (eds.). Springer Science and Business Media Deutschland GmbH, p. 363-373 11 p. (Lecture Notes in Civil Engineering; vol. 251).

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

  • 2022

    Facilitating Smart Contract in Project Scheduling under Uncertainty-A Choquet Integral Approach

    He, C., Liu, M., Wang, Z., Chen, G., Zhang, Y. & Hsiang, S. M., 2022, Construction Research Congress 2022: Computer Applications, Automation, and Data Analytics - Selected Papers from Construction Research Congress 2022. Jazizadeh, F., Shealy, T. & Garvin, M. J. (eds.). American Society of Civil Engineers (ASCE), p. 930-939 10 p. (Construction Research Congress 2022: Computer Applications, Automation, and Data Analytics - Selected Papers from Construction Research Congress 2022; vol. 2-B).

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

  • 2021

    PROJECT DELIVERY CONTRACT LANGUAGE, SCHEDULES, AND COLLABORATION

    da Alves, T. C. L., Martinez, M., Liu, M. & Scala, N. M., 2021, IGLC 2021 - 29th Annual Conference of the International Group for Lean Construction - Lean Construction in Crisis Times: Responding to the Post-Pandemic AEC Industry Challenges. Alarcon, L. F., Gonzalez, V. A., Murguia, D. & Brioso, X. (eds.). Department of Engineering, Civil Engineering Division, Pontificia Universidad Catolica del Peru, p. 33-42 10 p. (IGLC 2021 - 29th Annual Conference of the International Group for Lean Construction - Lean Construction in Crisis Times: Responding to the Post-Pandemic AEC Industry Challenges).

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    Open Access
    2 Scopus citations
  • THE EMERGENCE AND GROWTH OF THE ON-LINE SERIOUS GAMES AND PARTICIPATORY SIMULATION GROUP “APLSO”

    Rybkowski, Z. K., da Alves, T. C. L. & Liu, M., 2021, IGLC 2021 - 29th Annual Conference of the International Group for Lean Construction - Lean Construction in Crisis Times: Responding to the Post-Pandemic AEC Industry Challenges. Alarcon, L. F., Gonzalez, V. A., Murguia, D. & Brioso, X. (eds.). Department of Engineering, Civil Engineering Division, Pontificia Universidad Catolica del Peru, p. 269-278 10 p. (IGLC 2021 - 29th Annual Conference of the International Group for Lean Construction - Lean Construction in Crisis Times: Responding to the Post-Pandemic AEC Industry Challenges).

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    Open Access
    1 Scopus citations
  • 2020

    A Review of Practices for Municipal Road Maintenance Construction Funding Allocation in the United States

    Bonilla, M., Rasdorf, W., Liu, M. & Al-Ghandour, M., 2020, Construction Research Congress 2020: Project Management and Controls, Materials, and Contracts - Selected Papers from the Construction Research Congress 2020. Grau, D., Tang, P. & El Asmar, M. (eds.). American Society of Civil Engineers (ASCE), p. 832-840 9 p. (Construction Research Congress 2020: Project Management and Controls, Materials, and Contracts - Selected Papers from the Construction Research Congress 2020).

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

  • 2018

    Constraint removal and work plan reliability: A bridge project case study

    Javanmardi, A., Alireza Abbasian-Hosseini, S., Hsiang, S. M. & Liu, M., 2018, IGLC 2018 - Proceedings of the 26th Annual Conference of the International Group for Lean Construction: Evolving Lean Construction Towards Mature Production Management Across Cultures and Frontiers. Gonzalez, V. A. (ed.). The International Group for Lean Construction, p. 807-817 11 p. (IGLC 2018 - Proceedings of the 26th Annual Conference of the International Group for Lean Construction: Evolving Lean Construction Towards Mature Production Management Across Cultures and Frontiers; vol. 2).

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    Open Access
    4 Scopus citations
  • 2016

    Relationship between On-Site Planning Efforts and Work Plan Reliability

    Abbasian-Hosseini, S. A., Howell, G. & Liu, M., 2016, Construction Research Congress 2016: Old and New Construction Technologies Converge in Historic San Juan - Proceedings of the 2016 Construction Research Congress, CRC 2016. Perdomo-Rivera, J. L., Lopez del Puerto, C., Gonzalez-Quevedo, A., Maldonado-Fortunet, F. & Molina-Bas, O. I. (eds.). American Society of Civil Engineers (ASCE), p. 2129-2138 10 p. (Construction Research Congress 2016: Old and New Construction Technologies Converge in Historic San Juan - Proceedings of the 2016 Construction Research Congress, CRC 2016).

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    4 Scopus citations
  • 2015

    Social network analysis for construction specialty trade interference and work plan reliability

    Abbasian-Hosseini, S. A., Liu, M. & Hsiang, S. M., 2015, Proceedings of IGLC 23 - 23rd Annual Conference of the International Group for Lean Construction: Global Knowledge - Global Solutions. Arroyo, P., Seppanen, O. & Gonzalez, V. A. (eds.). The International Group for Lean Construction, p. 143-152 10 p. (Proceedings of IGLC 23 - 23rd Annual Conference of the International Group for Lean Construction: Global Knowledge - Global Solutions; vol. 2015-January).

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    2 Scopus citations
  • 2012

    Predicting the preliminary engineering duration of bridge projects

    Liu, M., Rasdorf, W., Hollar, D. A., Hummer, J. E. & Parikh, S. C., 2012, Construction Research Congress 2012: Construction Challenges in a Flat World, Proceedings of the 2012 Construction Research Congress. p. 505-514 10 p. (Construction Research Congress 2012: Construction Challenges in a Flat World, Proceedings of the 2012 Construction Research Congress).

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    1 Scopus citations
  • 2011

    A case study into task variation and the social network of construction trades

    Wambeke, B. W., Liu, M. & Hsiang, S. M., 2011, 19th Annual Conference of the International Group for Lean Construction 2011, IGLC 2011. p. 302-311 10 p. (19th Annual Conference of the International Group for Lean Construction 2011, IGLC 2011).

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

  • Causes and penalties of variation - A case study of a concrete slab prefabrication shop

    Wang, C., Hsiang, S. & Liu, M., 2011, 19th Annual Conference of the International Group for Lean Construction 2011, IGLC 2011. p. 220-229 10 p. (19th Annual Conference of the International Group for Lean Construction 2011, IGLC 2011).

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    1 Scopus citations
  • Planning to reduce variation in construction related tasks

    Wambeke, B. W., Liu, M. & Hsiang, S. M., 2011, Annual Conference of the Canadian Society for Civil Engineering 2011, CSCE 2011. p. 2485-2494 10 p. (Proceedings, Annual Conference - Canadian Society for Civil Engineering; vol. 3).

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

  • Predicting preliminary engineering costs for bridge projects

    Rasdorf, W., Liu, M., Hummer, J. E. & Hollar, D. A., 2011, Annual Conference of the Canadian Society for Civil Engineering 2011, CSCE 2011. p. 1855-1863 9 p. (Proceedings, Annual Conference - Canadian Society for Civil Engineering; vol. 3).

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

  • 2010

    Causes of variation in construction task starting times and duration

    Wambeke, B., Liu, M. & Hsiang, S. M., 2010, Construction Research Congress 2010: Innovation for Reshaping Construction Practice - Proceedings of the 2010 Construction Research Congress. p. 980-989 10 p. (Construction Research Congress 2010: Innovation for Reshaping Construction Practice - Proceedings of the 2010 Construction Research Congress).

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    1 Scopus citations
  • 2008

    Improving labor productivity through production control

    Liu, M. & Ballard, G., 2008, Proceedings of IGLC16: 16th Annual Conference of the International Group for Lean Construction. p. 657-666 10 p. (Proceedings of IGLC16: 16th Annual Conference of the International Group for Lean Construction).

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    51 Scopus citations